Case study

Cromwell Mulch Installation

A bed reset where edge quality and soil prep changed the final result more than the product layer.

Before and after flow

  1. Initial site read and edge condition check
  2. Debris and debris removal before placement
  3. Core edge shaping before material
  4. Final walkthrough and follow-up notes

Every completed job follows a similar structure: documented evidence, clear sequence, practical recommendation, and property handoff.

← Back to the Project Library